Throughout this week, we used our class time to complete and fill out our production paperwork. This paper work consisted of; production schedule, call sheet, location list, cast list and location Reccies. The production schedule is used to arrange and control optimizing work and workloads, as to what specific days we will be filming, where we will be filming and the actors required. Production schedules keep us organised and focused, as to when we need to carry out our filming. Our cast list indicates what actors are playing what role in the film, in reference to what character they are playing. Also the cast list states the filming times and availability of actors. The call sheet simply lists the date and time of our filming, location, script shot numbers, actors required, crew required, equipment required and travel arrangements. The location list highlights what props are going to be used and where exactly we are filming in real life and where these locations will be in the actual film. The location Reccies gives a deeper insight into the locations, as to why they are being used and when they are going to be shown in our film in reference to what frames these locations are going to be seen.
No comments:
Post a Comment